MIA CARA

Miacara Lucca Long Leash

$145 $155

MiaCara presents a contemporary twist on a timeless classic with the new Lucca collection of modern rope dog collars and leads.

This ever-popular and much-copied style originated in Italy in the 80’s. Now re-imagined by the design team at MiaCara, the Lucca collection uses only the finest materials to ensure the ultimate in style and durability in dog leash.

The Lucca rope collar and leash are handcrafted from heathered braid waxed cotton, natural, un-split, full-grain cowhide leather and satin plated full-brass hook – all made in Italy.

The Lucca dog leash is 6 inches long. One size only.

Color:
Quantity:
We're here and happy to answer any product questions you have. Send us a note!

You may also like

Recently viewed